Existing conditions and loads
Review the intended use, available services, equipment, occupancy and constraints that affect system design.
Mechanical, electrical and plumbing design organized around the building, its use and the permit path.
Discuss this service
Equipment, distribution routes, structure, room layouts and service capacity affect one another.
Kernel defines the required disciplines and coordinates their drawings so the submission and construction team receive one consistent direction.
Examples of the conditions, design decisions and field reviews involved in this service.

The review, calculations, drawings and field support included depend on the building and the agreed scope.
Review the intended use, available services, equipment, occupancy and constraints that affect system design.
Complete the calculations, layouts, selections and schedules required for the mechanical, electrical and plumbing scope.
Resolve routes, equipment locations, structural interfaces and architectural clearances before issue.
Provide permit information, respond to review comments and clarify design intent during construction when included.
Choose the project type closest to your work for a detailed explanation of engineering, deliverables, permit considerations and FAQs.
Tell us the building use, proposed work and permit status. We will confirm which disciplines and drawings are required.
Send project detailsAnswers about scope, deliverables, coordination and what to send before the work begins.
Building systems include heating, cooling, ventilation, electrical power and lighting, water, sanitary drainage, venting and the equipment and controls that make a building usable.
The systems share rooms, ceilings, shafts, roof space, service capacity and structural openings. Coordination reduces conflicting equipment locations, routes and permit information.
No. The proposed use, equipment, fixture changes, service capacity and municipal requirements determine which disciplines are needed. Kernel confirms the required scope before design begins.
Yes, within a defined scope and based on accessible equipment, records and information supplied by utilities, owners or other parties. Further testing or specialist work may be required where records are incomplete.
Send the address, building use, floor plans, proposed equipment or fixture changes, available base-building drawings and any permit comments already received.