Residential and commercial building services

Accessory dwelling unit design and permits.

Coordinated drawings for an additional residential unit inside, attached to or associated with an existing property.

Detailed residential building model used to coordinate an architectural design
Residential architectural coordination
PEO licensed Professional engineering practice30+ years Engineering and building experienceFixed pricing Up front for the agreed written scope

Clear definition

What is an accessory dwelling unit?

An accessory dwelling unit, often called an ADU, additional residential unit or secondary suite, is an independent living space with its own sleeping, cooking and bathroom facilities on the same property as a principal home.

Depending on the property and municipal rules, the unit may be created within the house, in an addition, or in a detached building. The design must resolve zoning, layout, fire and life safety, structure, heating, ventilation, electrical and plumbing requirements as one project.

What the design addresses.

The exact review, drawings and calculations depend on the building and the work described in the written proposal.

01

Property and zoning

Review the proposed unit location, property information and municipal constraints that affect the permitted form of the project.

02

Safe and functional layout

Coordinate rooms, exits, windows, stairs, fire separations, ceiling heights and service spaces.

03

Structure and alterations

Design new openings, beams, foundations, framing or reinforcement introduced by the conversion or addition.

04

Building systems

Define heating, ventilation, electrical and plumbing work required for a complete permit submission when included.

Common project types

Where this service is used.

  • Basement and interior secondary suites
  • Units within a residential addition
  • Detached accessory units where permitted
  • Conversion or legalization of existing space

Typical deliverables

What the scope can include.

  • Existing and proposed floor plans
  • Elevations and building sections where required
  • Fire-separation, egress and code information
  • Structural drawings and calculations for altered construction
  • Mechanical, electrical and plumbing information where included
  • Municipal comment responses related to the agreed design

Before construction

Permit and approval considerations.

Additional residential units are governed by the Ontario Building Code and municipal zoning rules, and the available options vary with the lot, building type and location. Parking, entrances, servicing, conservation or other approvals may also affect the project.

Kernel starts by defining the intended unit and available information, then identifies the architectural and engineering disciplines required for the permit package. Approval remains the decision of the applicable municipality and other authorities.

Accessory dwelling unit design and engineering FAQs

Specific answers about scope, permits, engineering decisions and what to send before the work begins.

What is the difference between an ADU and a secondary suite?

The terms are often used for related forms of additional housing. Municipalities may use terms such as additional residential unit, accessory dwelling unit or secondary suite for units within, attached to or detached from a principal home. The property-specific zoning and permit path determine the applicable definition.

Can I add an ADU in my basement?

A basement may be suitable if the layout can meet applicable requirements for exits, fire separations, ceiling height, windows, heating, plumbing and other life-safety provisions. Existing conditions and local zoning must be reviewed before the design is confirmed.

Will I need mechanical, electrical and plumbing drawings?

That depends on the existing systems, proposed equipment, fixture changes and municipal submission requirements. Kernel identifies the disciplines needed and lists them in the written scope before work begins.

Can you design a separate basement entrance at the same time?

Yes. A basement walkout can be coordinated with the unit layout and permit package. The foundation opening, exterior stairs, drainage and site constraints require their own design considerations.

Can an existing unpermitted unit be legalized?

Sometimes, but the current space must be documented and compared with the applicable zoning, code and permit requirements. Concealed or deficient construction may require investigation, alteration or separate trade work before approval.

What information is useful for an ADU quote?

Send the property address, survey and existing drawings if available, photographs, the preferred unit location and any known municipal correspondence. A simple sketch of the intended rooms is also useful.

Discuss your project with an engineer.

Send the property address, intended work and any drawings or photographs you already have. Kernel will confirm the appropriate written scope and fixed price up front.

Send project details